Issues 103, 104, 105, 114 |
Issues 103-105 are what we need right now. We have 107-113 waiting, and 114 just keeps us on 'schedule'.
Issue 103 - Cable and Wires, Right Side
Parts in Issue 103 |
This is the same as where we last left off with issues 101 and 102, just on the other side. More wires and more twist ties.
Issue 104 - Junction Box, Top Left
Contents of Issues 104 |
Issue 104 - Junction Box, Top Right
Issues 104 and 105 deal with the flux boxes mounted on the T-panel. Some more fiber optic like tubes as with the front flux boxes. Pretty straight forward build that should be familiar.
Contents of Issue 105 |
Issues 104 and 105 deal with the flux boxes mounted on the T-panel. Some more fiber optic like tubes as with the front flux boxes. Pretty straight forward build that should be familiar.
Issue 114 - Reactor Drum
Parts in Issue 114 |
We are not going to get to this issue this time. This was a relatively stress-free shipment that only required intermediate building skills. Next time we continue with Issue 106 and on. I have already took a peek in the box and it looks like fun.
Build up to Issue 105 |
Screw count: 96-AP, 25-BP, 2-CP, 22-AM, 13-BM, 4-EM, 4-CM, 38-DM, 3-DP, 1-FM, 3-GM, 3-HM, 2-IM, 2-EP, 19-FP, 2-JM, 5-HP, 3-GP, 16-NM, 2-MM, 9-KM, 2-LM, 15-IP, 1-OM, 1-PM, 4-JP, 2-KP, 3-QM, 2-LP, 6-MP 1-RM
to be continued...
No comments:
Post a Comment